Route 132 in Rimouski

Global description

This project concerns the supervision of partial repair work on a bridge on Route 132 over the Rimouski River. Atelier 7hz drafted the noise management program and the monitoring plan, and carried out the noise monitoring measures.

Challenges

Residences are present in the immediate vicinity of the works. Two sensitive areas were determined and noise level simulations were carried out for each of these areas during the different phases of the work. When the regulatory thresholds were exceeded, noise reduction measures have been recommended.

Date : 2021-2022 – Client : City of Saint-Hyacinthe