
Aquatic Complex Rosemont
Global description
Aiming to a LEED-Gold certification, the aquatic complex will be built at the corner of 8th Avenue and rue de Bellechasse. It will include a 25-meter main basin and eight corridors, as well as a secondary basin, bleachers and multifunctional rooms. In a later phase, the future aquatic complex, the Rosemont Library and a new House of Culture (at the location of the current pool) will be connected together.
Challenges
Given the size of the space between the two pools, it was a great challenge to control the reverberation time and background noise. The sizing of the acoustic solutions has been made closer to the needs and expectations of the customer.
Date: 2018 – Architect: Poirier Fontaine Architect