Work at Pont Rivest

Global description

This project concerns the monitoring of noise and vibrations emitted by the demolition and construction of the new Rivest bridge over the Assomption River in Repentigny. Atelier 7hz drafted the noise management program and the vibration monitoring plan for the different phases of the project.

Challenges

Many residences are present in the immediate vicinity of the works. This study made it possible to determine the feasible measures to minimize the impacts and identify the follow-up measures required. In the event of foreseeable exceedances of the regulatory thresholds, follow-up measures and noise reduction solutions have been recommended.

Date : 2022 – Client : Hamel Construction